世界银行-10 ASL年可持续景观计划-十年的联系:2015年亚马逊的人、机构和景观(英)

Amazon Sustainable Landscapes Program A Decade of Connections: People, Institutions and Landscapes in the Amazon2015-2025 Supported byLed byPublic Disclosure AuthorizedPublic Disclosure AuthorizedPublic Disclosure AuthorizedPublic Disclosure AuthorizedAmazon Sustainable Landscapes Program A Decade of Connections: People, Institutions and Landscapes in the Amazon2015-2025 ©2025 International Bank for Reconstruction and Development/The World Bank1818 H Street NW | Washington D.C., 20433 Tel: +1 (202) 473 1000 | www.worldbank.orgSpecial report The report has not been peer reviewed. The find-ings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundar-ies, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of the World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and permissionsThe material in this work is subject to copyright. Because The World Bank encourages dissemina-tion of its knowledge, this work may be reproduced, in whole or in part, for non-commercial purposes as long as full attribution to this work is given. Any queries on rights and licenses, including subsidiary rights, should be addressed to:World Bank Publications The World Bank Group 1818 H Street NW, Washington, DC 20433 Fax: 202-522-2625 Email: pubrights@worldbank.orgCorlazzoli, Vanessa, and Ana María González Velosa. 10 ASL Years. Amazon Sustainable Landscapes Program. A Decade of Connections: People, Institutions and Landscapes in the Amazon 2015–2025. Washington, DC: World Bank Group, 2025PREFACE .......................................................................................................................................................2MESSAGE FROM THE GEF ............................................................................................................................4MESSAGE FROM THE WORLD BANK ...........................................................................................................5EXECUTIVE SUMMARY .................................................................................................................................6ABBREVIATIONS ...........................................................................................................................................9INTRODUCTION ..........................................................................................................................................12INTEGRATED APPROACH FOR CONSERVATION AND SUSTAINABLE MANAGEMENT ............................20ACHIEVEMENTS BY PILLARADDED VALUE OF ASL REGIONAL PROJECTS ..........................................................................................60LESSONS LEARNED ........

立即下载
金融
2025-11-06
45页
15.67M
收藏
分享

世界银行-10 ASL年可持续景观计划-十年的联系:2015年亚马逊的人、机构和景观(英),点击即可下载。报告格式为PDF,大小15.67M,页数45页,欢迎下载。

本报告共45页,只提供前10页预览,清晰完整版报告请下载后查看,喜欢就下载吧!
立即下载
本报告共45页,只提供前10页预览,清晰完整版报告请下载后查看,喜欢就下载吧!
立即下载
水滴研报所有报告均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
相关图表
图表 11. 城投企业商票逾期情况(2023 年第一季度~2025 年第三季度)
金融
2025-11-06
来源:尾部中小金融机构风险加快出清——2025年第三季度债券市场信用风险分析
查看原文
图表 10. 2025 年前三季度城投企业非标风险事件情况(次)
金融
2025-11-06
来源:尾部中小金融机构风险加快出清——2025年第三季度债券市场信用风险分析
查看原文
图表 9. 被下达清盘令的港股上市房企
金融
2025-11-06
来源:尾部中小金融机构风险加快出清——2025年第三季度债券市场信用风险分析
查看原文
图表 8. 2025 年第三季度出险房企打包展期情况
金融
2025-11-06
来源:尾部中小金融机构风险加快出清——2025年第三季度债券市场信用风险分析
查看原文
图表 6. 金融监管总局对“明天系”四家保险公司处罚情况
金融
2025-11-06
来源:尾部中小金融机构风险加快出清——2025年第三季度债券市场信用风险分析
查看原文
图表 5. 债券市场金融债偿付风险事件
金融
2025-11-06
来源:尾部中小金融机构风险加快出清——2025年第三季度债券市场信用风险分析
查看原文
回顶部
报告群
公众号
小程序
在线客服
收起